Q.No.1

Upper Tamakoshi hydroelectric project, which is under construction, will have installed capacity of ------------

Q.No.2

According to Environment Protection Act (EPA), 2019 of Nepal, which of the following Environmental Assessment (EA) processes mandatorily requires scoping document.

Q.No.3

The sludge produced in an activated sludge process is considered as an average sludge when the sludge volume index (SVI) is

Q.No.4

------------ is not a consideration for site selection of hydroelectric power plant.

Q.No.5

The critical velocity (Vcs) to settle a particle is given by

Q.No.6

Which element of hydroelectric power plant prevents the penstock from water hammer phenomenon?

Q.No.7

Forebay in hydroelectric power plant is a -------

Q.No.8

Which principle is used in Hydraulic Turbines?

Q.No.9

As per Nepal Road Standards (NRS 2070), the cross slope of a Water Bound Macadam (WBM) road should be considered as

Q.No.10

The viscosity of a bitumen sample is expressed in


About Simple Quiz

We're here to make learning fun and accessible. Whether you're a student, teacher, or just someone who loves quizzes, you can find something for you here. Test your knowledge across a wide range of subjects and see how much you know!


Get to know more

Quizzes under Civil Engineering


Start A Quiz

Do you want to start quiz mode? In this mode, you’ll answer against a timer. When the timer runs out, answers auto-submit, and you get feedback.

Start A Quiz

Do you want to start quiz mode? You'll answer against a timer. When the timer runs out, answers auto-submit